
On 6 November 2026 (latest available), Bank Negara Malaysia’s 5pm middle rate was RM3.1688 per SGD 1, so an RM800,000 home in Johor Bahru costs about S$252,500 and an RM2,800 monthly rent is worth about S$884. Three years earlier (6 Nov 2023, RM3.4361) the same RM800,000 cost about S$232,800; five years earlier (5 Nov 2021, RM3.0734) about S$260,300. Over the past 12 months the rate ranged from RM3.0639 to RM3.2147.
For Singapore buyers, every JB property price, rent and loan instalment is in ringgit, while their salary and savings are usually in Singapore dollars. That makes the SGD to MYR exchange rate one of the quietest but most important numbers in any Johor Bahru property decision. This page puts the official reference rate in one place, shows what typical JB price points cost in SGD at six dates over the past five years, and walks through how currency moves change the SGD cost of a deposit, a monthly instalment and rental income.
All rates below are official reference rates from Bank Negara Malaysia (BNM), the central bank of Malaysia, quoted as ringgit per one Singapore dollar (middle rate, 5pm session). The property prices are round, illustrative numbers, not the price of any specific project. We do not forecast currencies: the aim is to help you understand the arithmetic and plan for a range of outcomes. This page is updated monthly.
SGD to MYR today: the official reference rate (November 2026)
The latest BNM reference rate available on 9 November 2026 is RM3.1688 per SGD 1, published for 6 November 2026 (5pm session, middle rate). The table compares it with the same measure one month, six months, one year, three years and five years earlier.
| Point in time | Exact date (BNM 5pm) | RM per SGD 1 (middle) | SGD buys vs today |
|---|---|---|---|
| Latest available | 6 Nov 2026 | 3.1688 | Baseline |
| 1 month ago | 6 Oct 2026 | 3.1953 | 0.8% more ringgit then |
| 6 months ago | 6 May 2026 | 3.1002 | 2.2% fewer ringgit then |
| 1 year ago | 6 Nov 2025 | 3.2052 | 1.1% more ringgit then |
| 3 years ago | 6 Nov 2023 | 3.4361 | 8.4% more ringgit then |
| 5 years ago | 5 Nov 2021 | 3.0734 | 3.0% fewer ringgit then |
Two more reference points help frame the past year. Between 6 November 2025 and 6 November 2026, the lowest BNM 5pm middle rate was 3.0639 on 18 March 2026 and the highest was 3.2147 on 10 September 2026. Monthly averages moved from about 3.19 in November 2025 down to about 3.09 in February and March 2026, then back up to about 3.19 to 3.20 in August to October 2026.
How to read the rate
- A higher number (for example 3.4361) means one Singapore dollar buys more ringgit, so JB property is cheaper in SGD terms.
- A lower number (for example 3.0734) means each Singapore dollar buys fewer ringgit, so the same RM price needs more SGD.
- Middle rate is the midpoint between BNM’s buying and selling rates. On 6 November 2026 they were 3.1662 and 3.1714. Retail rates from banks and remittance services include a spread, so you will usually receive a little less than the middle rate.
What RM500,000, RM800,000 and RM1 million cost in SGD
At today’s reference rate, RM500,000 is about S$157,800, RM800,000 about S$252,500 and RM1 million about S$315,600. The table shows the same ringgit prices converted at each historical rate, which is a simple way to see how much the exchange rate alone changes the SGD cost of an identical property.
| Date (rate) | RM500,000 in SGD | RM800,000 in SGD | RM1,000,000 in SGD |
|---|---|---|---|
| 6 Nov 2026 (3.1688) | S$157,788 | S$252,461 | S$315,577 |
| 6 Oct 2026 (3.1953) | S$156,480 | S$250,368 | S$312,960 |
| 6 May 2026 (3.1002) | S$161,280 | S$258,048 | S$322,560 |
| 6 Nov 2025 (3.2052) | S$155,997 | S$249,594 | S$311,993 |
| 6 Nov 2023 (3.4361) | S$145,514 | S$232,822 | S$291,028 |
| 5 Nov 2021 (3.0734) | S$162,686 | S$260,298 | S$325,373 |
The spread between the strongest and weakest SGD in this table is meaningful. On an RM1 million purchase, the difference between the November 2023 rate and the November 2021 rate is about S$34,300, before any change in the property price itself. Over the past 12 months alone (3.0639 to 3.2147), the SGD cost of RM1 million ranged from about S$311,100 to S$326,400.
Why the RM1 million line matters for Singapore buyers
Johor generally applies a minimum purchase price of RM1 million for foreign buyers of most residential property, with state consent required, so many Singaporeans who do not hold Malaysian status will be looking at the RM1 million line or above. Read our guide for Singaporeans buying property in JB for the eligibility rules, and use the JB property calculator to add stamp duty, legal fees and loan costs in ringgit before converting the total.
What JB rent of RM2,800 a month is worth in SGD
An RM2,800 monthly rent, the median asking rent for a 2-bedroom condo near the JB CIQ and Bukit Chagar RTS station in our Q4 2026 rent index, is worth about S$884 at today’s rate and about S$10,600 a year. For a Singapore-based landlord, the ringgit rent is fixed by the local market, so the SGD value moves with the exchange rate.
| Date (rate) | RM2,800 per month in SGD | RM33,600 per year in SGD |
|---|---|---|
| 6 Nov 2026 (3.1688) | S$884 | S$10,603 |
| 6 Nov 2025 (3.2052) | S$874 | S$10,483 |
| 6 Nov 2023 (3.4361) | S$815 | S$9,778 |
| 5 Nov 2021 (3.0734) | S$911 | S$10,933 |
Notice the mirror image: a stronger SGD makes buying cheaper but reduces the SGD value of ringgit rent, while a weaker SGD does the opposite. Yield calculated in ringgit (annual RM rent divided by RM price) is not affected by the exchange rate at all; only the SGD value of your capital and income is. For the full rent data by project and unit type, see the JB RTS and CIQ rent index.
How the exchange rate affects loan instalments for SGD earners
If you borrow in ringgit and earn in Singapore dollars, your instalment is fixed in RM but the SGD you need each month changes with the rate. In the illustrative example below, the difference between the 12-month high and low rates is about S$42 a month on the same loan.
Assumptions (illustrative only, not a loan offer): a property at RM800,000, a loan of RM560,000 (70% margin), a 30-year tenure and an assumed interest rate of 4.2% a year, giving an instalment of about RM2,738 a month. Actual rates vary by bank and borrower; compare current packages on our Malaysia home loan rates by bank page.
| Exchange rate scenario | RM per SGD 1 | RM2,738 instalment in SGD | Per year in SGD |
|---|---|---|---|
| 3 years ago (6 Nov 2023) | 3.4361 | S$797 | S$9,562 |
| 12-month high (10 Sep 2026) | 3.2147 | S$852 | S$10,221 |
| Latest (6 Nov 2026) | 3.1688 | S$864 | S$10,369 |
| 12-month low (18 Mar 2026) | 3.0639 | S$894 | S$10,724 |
A useful rule of thumb: every 0.10 move in the rate (for example from 3.17 to 3.07) changes the SGD cost of a ringgit instalment by roughly 3%. Over a 30-year loan that sensitivity matters more than any single month, which is why many SGD earners plan their budget on a range of rates rather than today’s figure.
Rent as a natural offset
When a JB unit is let out, the ringgit rent and the ringgit instalment move together in SGD terms: if the ringgit weakens, both your instalment and your rent are worth fewer SGD. In the example above, an RM2,800 rent would cover the RM2,738 instalment before running costs, regardless of the exchange rate. Running costs such as maintenance fees, quit rent, assessment, insurance and vacancy periods still need a buffer; our JB condo rental yield guide shows a gross versus net example.
Why the rate you get differs from the BNM reference rate
BNM’s middle rate is a reference, not a retail price. When you move money, the rate you actually receive is the provider’s rate, which includes a spread, and there may also be a fixed fee. On a large transfer such as a down payment, a small difference in spread adds up quickly.
- Compare the total cost: ask each provider how many ringgit will arrive for a given SGD amount after all fees, rather than comparing headline rates.
- Use regulated channels: Singapore banks and licensed remittance companies, and in Malaysia licensed banks, keep proper records that your lawyer and the developer or seller can match to the SPA payment schedule.
- Keep the paper trail: transfer confirmations matter for the loan, the SPA and any later sale or repatriation of proceeds.
Our step-by-step guide on how to transfer money to buy property in Malaysia covers the practical side, including which payments go to the lawyer’s stakeholder account.
Managing currency risk: practical options (no predictions)
Nobody can reliably predict the SGD to MYR rate, so the practical goal is to make sure your plan still works across a realistic range of outcomes. These are common, neutral approaches; which ones fit depends on your income, timeline and risk tolerance.
- Budget on a range, not a point: test your affordability at the past 12-month low (3.0639) as well as today’s rate. If the numbers only work at a favourable rate, the plan is fragile.
- Borrow in the currency of the asset: a ringgit loan against a ringgit property means the largest liability moves with the asset’s currency. It does not remove risk on your SGD-funded equity and instalments, but it avoids a second mismatch.
- Convert in stages: for an under-construction purchase with progressive payments, converting in tranches as payments fall due spreads the exchange rate over time instead of fixing it on one day.
- Hold a ringgit buffer: keeping a few months of instalments and running costs in a Malaysian account reduces pressure to convert at an inconvenient time.
- Let rent cover ringgit costs: if the unit is tenanted, paying the instalment and maintenance directly from ringgit rent avoids converting back and forth.
- Ask your bank about hedging products: some banks offer forward contracts or multi-currency accounts. Their suitability and costs vary, so get advice from a licensed adviser.
What the exchange rate means for Causewayz Square buyers
For an under-construction project such as Causewayz Square, about 600 m from the JB CIQ with completion targeted around 2030, the exchange rate affects SGD buyers at three stages: the booking and down payment, progressive payments during construction, and instalments plus rental income after completion. The SPA price is fixed in ringgit when you sign, so only the SGD cost of each payment varies with the rate on the day you pay.
Because payments are spread over several years under progressive billing, the effective SGD cost is a blend of many rates rather than one. That is the practical reason staged conversion is common with new launches. For the latest SPA price list for Causewayz Square, WhatsApp us, then convert it at today’s rate and at the 12-month low to see your range.
Quick checklist for SGD buyers
- Note the BNM reference rate on the day you book and keep it with your records.
- Get a written quote from your transfer provider for the down payment amount.
- Map your progressive payment schedule and decide how you will fund each stage.
- Check the loan margin and tenure you qualify for as a foreign or Singapore-based borrower.
- Estimate rent in ringgit using current data, not hoped-for figures.
Method and update schedule
Rates are Bank Negara Malaysia’s middle rates for the 5pm session, quoted as ringgit per one Singapore dollar, taken from BNM’s official exchange rate data on 9 November 2026. Where a target date fell on a weekend or public holiday, the nearest earlier business day was used (5 November 2021). SGD figures are RM amounts divided by the rate and rounded to the nearest dollar. The 12-month high and low are taken from the daily 5pm middle rates between 6 November 2025 and 6 November 2026. Updated monthly: we refresh the table early each month; past editions keep their original dates so comparisons stay transparent.
For more on JB property and the RTS Link, see our guide to condos near the JB RTS Link and the JB condo transaction prices near CIQ and RTS. To talk through your numbers, WhatsApp us.
Sources
- Bank Negara Malaysia, Exchange Rates (middle rate, 5pm session, Ringgit per foreign currency)
- Bank Negara Malaysia Open API, SGD exchange rate by date and month (retrieved 9 Nov 2026)
- exsimciqrts.com JB RTS and CIQ Rent Index, Q4 2026 (2-bed median asking rent RM2,800)
This guide is general information, not financial advice.